Click Here to go to our main page.

Your Source For Solid Solutions To Complicated Ground Conditions
Site Map Search Contact Us Featured Projects Services

Back Up Next

Minipiles

Addition to Wastewater

Treatment Plant
Virginia Beach, Virginia.

 

General Contractor:

Blueridge General

 

Project required steel pipe minipiles for a building addition due to wet, soft soils adjacent to the existing building.

 

7" diameter minipiles x 80’ depth (18 foot bond zone). 50 ton capacity minipiles were installed in limited headroom of 13 feet.

 

  Back Up Next

Home Site Map Search Contact Us Featured Projects Services
 
Technical Foundations, Incorporated
P.O. Box 50282 w Richmond, VA  23250 w (804) 328-4500 w fax: (804) 328-4510
Copyright © 2007 Technical Foundations, Inc.
Last modified: June 19, 2007