Fabricast bags were placed at the toe of the spillway to stabilize the structure at the down stream end. Minipiles were drilled and installed through the grout bags to anchor the toe and prevent any possible movement of the structure. Pressure grouting was performed beneath the spillway slab to fill void areas and reduce any erosion of base material. |