Augercast piles were the answer to a difficult foundation problem. The lot for this house was low in price, in a good location, but consisted of unsuitable soils. Footings or piles were required for support. 38 piles 12' to 25' long were installed. The job took only 2 days with little disruption to the lot or neighborhood. |