In this application we used augered piles to serve as shoring walls for a new pit and as foundation piles for a new vat. The augered pile method allows the shoring to be installed in one continuous operation followed by excavation to full depth. This procedure resulted in a more efficient schedule for shoring and the augered foundation piles.
 

 

 

Auger Cast-In-Place Piles

 

New Cold Shear Pit

Charlotte, NC

 

10" diameter piles x 30' depth were installed as temporary shoring for a pit excavation in existing steel mill for a new cold shear pit.