Temporary shoring at existing column locations for pit excavation. Greenville, NC General Contractor: Miller Building 12" diameter piles x 20' depth were installed as temporary shoring for a new press pit at a manufacturing facility. Auger cast-in-place piles were also installed to support the new press. Piles were drilled and installed in 33' of headroom. |